AC Overlay Pavement Project
Project Description
Rehabilitate major roads and residential streets. Project work includes overlaying the roadway with asphalt concrete or placing a slurry seal, repairing failed areas of the pavement (base repair), installing ADA curb ramps and other accessibility improvements, repairing damaged gutter or sidewalk, installing video signal detection, adjusting manholes, restriping the roadway, and other various items of work necessary to complete the project.
2027 Planning
Note: Project locations have not been fully planned. Public input and comments are welcome.
2026 Planning
Note: The following roadways have been identified for pavement maintenance and rehabilitation work to be completed in 2026. Additional locations may be identified because maintenance needs can develop within a short period of time due to an aging roadway system. These locations will be reported in the Completed Project Expenditure Report.
AC Overlay Project 2026 Phase A
- District 1/4: Elkhorn Blvd from 26th Ave to 32nd St
- District 3/4: Walerga Rd from Don Julio Blvd to Antelope Rd
- District 3/4: Madison Ave from Kenneth Ave to Hazel Ave
- District 3: Sunrise Blvd from Sunset Ave to Sunrise Ridge Br
- District 4: Oak Ave from Chestnut to Santa Juanita Ave
- District 3/4: Antelope Rd from Walerga Rd to Elverta Rd
- District 3: Watt Ave form El Camino Ave to Marconi Ave
- District 3: 6411 Grant Avenue (Culvert Replacement Only)
AC Overlay Project 2026 Phase B
- District 1/2: Florin Rd from French Rd to 1,000 ft e/o Gardner Ave
- District 1/Sac: 47th Ave from Perry Ave to Roosevelt Ave
- District 1/Sac: 48th Ave from Perry Ave to Roosevelt Ave
- District 1: Baker Ave from West end to Stockton Blvd
- District 4: Scott Rd from Boys Rand Rd to 3 miles north
- District 5: Consumnes Rd from Dillard Rd to Wilton Rd
- District 5: RM03A2 (North of Jackson Rd, East of Watt Ave, South of Wildrose Wy, West of Thornhill Dr)
- District 5: Alta Mesa Rd from Twin Cities Rd to Valinsin (Curve)
- District 5: Isleton Rd from 5,000 ft s/o Andrus Island Rd to 6,100 ft south
- District 5: River Rd from 660 ft s/o Locke Rd to 2,000 ft south
- District 5: RM06A (North of Kiefer Blvd, East of Rosemont Dr, South of Rosewood Dr, West of South Port Dr)
- District 5: RP01C West (Hyannis Wy [West of Bradshaw Rd], Adirondack Wy, Chad Ct)
Sac = City of Sacramento
RC = City of Rancho Cordova
AC Overlay Project 2026 Phase C
- District 3: Greenback Ln from HWY I80 to CH City Limits
- District 3: San Juan Ave from Fair Oaks Blvd to Winding Wy (North)
- District 3: Watt Ave from Arden Wy to Cottage Wy
AC Overlay Project 2026 Phase D
- District 3: Fair Oaks Village Park area (Fair Oaks Blvd from California Ave to Park Dr, California Ave from Fair Oaks Blvd to Temescal St, Main St from California Dr to Park Dr, Temescal St from California Ave to Main St, and Park Dr)
2025/2026
Note: The following roadways have been identified for pavement maintenance and rehabilitation work to be completed in 2025/2026. Additional locations may be identified because maintenance needs can develop within a short period of time due to an aging roadway system. These locations will be reported in the Completed Project Expenditure Report.
AC Overlay Project 2025 Phase A
- District 1/3/4: Watt Avenue from Roseville Road to James Way / Street
- District 3: Airbase Drive from Watt Avenue to overpass
- District 4: Roseville Road from Watt Avenue to Madison Avenue
- District 3: PH07B1 (North of Woodside Dr, East of Andrea Blvd, South of Tupelo Dr, West of Citrus Heights City Limits)
- District 3: Tarleton Dr Area (North of Hillsdale Blvd, East of and including Crowder Wy, South of Oakhollow Dr, West Of Walerga Rd)
- FR01B Partial (North of 41st Ave, East of 41 St, South of 34th Ave, West of 44th St)
- District 3: Sunrise Boulevard from Winding Way to Sunset Boulevard
- District 5: Grand Island Road from 6,000 ft north of the Grand Island Mansion to State Route 160
- District 5: River Road from 4,560 ft south of Twin Cities Road to 660 feet south of Locke Road
- District 3: CM11C (North of El Camino Ave, East of Mission Ave, South of Kenneth Ave, West of Walnut Ave)
- District 3: Keane Drive from Kipling Drive to east end
- District 3/4: Madison Avenue from Hazel Avenue to Blue Oak Drive
- District 3/Citrus Heights: Madison Ave from San Juan Avenue to Fair Oaks Boulevard
- District 5: RM03A1 (North of and including Canberra Dr, East of Watt Ave, South of Alderson Ave, West of Thornhill Dr)
- District 5: Crosswalk at Arcohe Union Elementary School (Ivie Road)
AC Overlay Project 2025 Phase B
- District 4: Elkhorn Boulevard from 18th Street to 26th Street
- District 4/Rancho Cordova: Grant Line Road from Jackson Road to Keiver Boulevard
- District 5: Bradshaw Road from Folsom Boulevard to Hyannis Way
- District 5: Isleton Road from 1,100 ft north of Andrus Island Road to 3,300 ft south of Andrus Island Road
- District 5: Twin Cities Road from Cosumnes River (8,830 ft west of Pellandini Road) to Pellandini Road
- District 3: FF01B (North of Palm Ave, East of HWY I-80, South of Leader Ave, West of Garfield Ave)
- District 3: Fair Oaks Boulevard from Manzanita Avenue to Marshall Avenue
- District 3: FO14C Partial (Hidden Valley Cir, Ranchita Wy, Van Dyce Wy)
- District 3: FO08B Partial (Buchannan Dr and Deerwood Ct)
- District 3: TC04A (North of El Camino Ave, East of Fulton Ave, South of Marconi Ave, West of Morse Ave)