Rehabilitate major roads and residential streets. Project work includes overlaying the roadway with asphalt concrete or placing a slurry seal, repairing failed areas of the pavement (base repair), installing ADA curb ramps and other accessibility improvements, repairing damaged gutter or sidewalk, installing video signal detection, adjusting manholes, restriping the roadway, and other various items of work necessary to complete the project.
2026
Note: The following roadways have been identified for pavement maintenance and rehabilitation work to be completed in 2026. Additional locations may be identified because maintenance needs can develop within a short period of time due to an aging roadway system. These locations will be reported in the Completed Project Expenditure Report.
AC Overlay Project 2026 Phase A
- District 1/4: Elkhorn Blvd from 26th Ave to 32nd St
- District 3/4: Walerga Rd from Don Julio Blvd to Antelope Rd
- District 3/4: Madison Ave from Kenneth Ave to Hazel Ave
- District 3: Sunrise Blvd from Sunset Ave to Sunrise Ridge Br
- District 4: Oak Ave from Chestnut to Santa Juanita Ave
- District 3/4: Antelope Rd from Walerga Rd to Elverta Rd
- District 3: Watt Ave form El Camino Ave to Marconi Ave
- District 3: 6411 Grant Avenue (Culvert Replacement Only)
AC Overlay Project 2026 Phase B
- District 1/2: Florin Rd from French Rd to 1,000 ft e/o Gardner Ave
- District 1/Sac: 47th Ave from Perry Ave to Roosevelt Ave
- District 1/Sac: 48th Ave from Perry Ave to Roosevelt Ave
- District 1: Baker Ave from West end to Stockton Blvd
- District 4: Scott Rd from Boys Rand Rd to 3 miles north
- District 5: Consumnes Rd from Dillard Rd to Wilton Rd
- District 5: RM03A2 (North of Jackson Rd, East of Watt Ave, South of Wildrose Wy, West of Thornhill Dr)
- District 5: Alta Mesa Rd from Twin Cities Rd to Valinsin (Curve)
- District 5: Isleton Rd from 5,000 ft s/o Andrus Island Rd to 6,100 ft south
- District 5: River Rd from 660 ft s/o Locke Rd to 2,000 ft south
- District 5: RM06A (North of Kiefer Blvd, East of Rosemont Dr, South of Rosewood Dr, West of South Port Dr)
- District 5: RP01C West (Hyannis Wy [West of Bradshaw Rd], Adirondack Wy, Chad Ct)
Sac = City of Sacramento
RC = City of Rancho Cordova
AC Overlay Project 2026 Phase C
- District 3: Greenback Ln from HWY I80 to CH City Limits
- District 3: San Juan Ave from Fair Oaks Blvd to Winding Wy (North)
- District 3: Watt Ave from Arden Wy to Cottage Wy
AC Overlay Project 2026 Phase D
- District 3: Fair Oaks Village Park area (Fair Oaks Blvd from California Ave to Park Dr, California Ave from Fair Oaks Blvd to Temescal St, Main St from California Dr to Park Dr, Temescal St from California Ave to Main St, and Park Dr)
2027 Planning
Note: The following roadways have been identified for pavement maintenance and rehabilitation work to be completed in 2027. Additional locations may be identified because maintenance needs can develop within a short period of time due to an aging roadway system. These locations will be reported in the Completed Project Expenditure Report.
AC Overlay Project 2027 Phase E:
- District 1/Sac: Florin Perkins Road from Florin Road to 1,300 ft north of Weyand Avenue
- District 1: Weyand Ave from Florin Perkins Road to east end
- District 1: Power Line Road from Del Paso Road to Bayou Way
- District 1: Del Paso Rd from Power Line Rd to City Limits (4,560 ft east of Power Line Road)
- District 2: FR03B (north of 47th Avenue, east of 44th Avenue, south of Lemon Hill Avenue, and west of Sampson Boulevard)
- District 2: FR03D (north of Lemon Hill Avenue, east of Sampson Boulevard, south of Fruitridge Road’ and west of Stockton Boulevard)
- District 4: Scott Road from Latrobe Road to Boys Ranch Road
- District 4: Elverta Road from Watt Avenue to Black Eagle Drive
- District 4: Lake Natoma Drive from Main Avenue to Madison Avenue
- District 4: Rio Linda Boulevard from West Elkhorn Boulevard to Q Street
- District 5: RP01A&B Partial (selected roads north of Folsom Boulevard, east of and including Mira Del Rio Dr, west of and including Escobar Way, and south of and including Mira Del Rio Drive)
- District 5: River Road from Vorden Road to 2.5 Miles north of Vorden Road
- District 5: Sherman Island Crossing Road (portion thereof for structural test section)
- District 5: Jackson Slough Road (portion thereof for structural test section)
Sac = City of Sacramento
AC Overlay Project 2027 Phase F:
- District 3: A003A (north of Ellington Circle, east of Morse Avenue, south of El Camino Avenue, and west of the west side of Country Club Centre)
- District 3: AP04A (north of and including Imran Drive, east of Bell Street, south of Hurley Way, and west of and including Clinton Road)
- District 3: FF04A Partial (selected roads north of Leader Avenue, east of Highway I-80, south of Greenback Lane, and west of Garfield Avenue)
- District 3: FO10B Partial (north of Winding Way, east of Kenneth Avenue, south of Sunset Avenue, and west of and including Kewanee Street)
- District 3/4: Antelope Road from Don Julio Boulevard to Antelope North Road
- District 3/Sac: Auburn Boulevard from 200 ft west of Park Road (at Bridge) to Myrtle Avenue
- District 3/Sac: Ethan Way from Arden Way to El Camino Avenue
- District 3: Hurley Avenue from Ethan Way to Watt Avenue
- District 3: Madison Avenue from Fair Oaks Boulevard to Kenneth Avenue
- District 3: Sunrise Boulevard from Sunrise Ridge Drive to Madison Avenue
Sac = City of Sacramento
2028 Planning
Note: The following roadways have been identified for pavement maintenance and rehabilitation work to be completed in 2028. Additional locations may be identified because maintenance needs can develop within a short period of time due to an aging roadway system. These locations will be reported in the Completed Project Expenditure Report.
AC Overlay Project 2028 Phase A:
- District 1: West Elverta Road from Garden Highway to 1,000 ft east of Earhart Drive
- District 1: North Bayou Wy from 700 ft east of Garden Highway to 3,700 ft eastward
- District 2: FR01C (north of 47th Avenue, east of Highway 99, south of 41st Avenue, and west of 44th Street)
- District 2: FR05B (north of Florin Road, east of RR Tracks, south of 47th Avenue, and west of Highway 99) (treatment: cape seal)
- District 2: FR03A1 (north of Lemon Hill Avenue, east of and including 44th Avenue, south of and including 37th Avenue, and west of Sampson Boulevard)
- District 4: Rio Linda Boulevard from Q Street to Elverta Road
- District 5: Dillard Road from Riley Road to Walmort Road (treatment: cape seal)
- District 5: Sunrise Boulevard from Grant Line Road to Jackson Road (treatment: cape seal)
- District 5: Elder Creek Road from Hedge Avenue to Bradhsaw Road
AC Overlay Project 2028 Phase B:
- District 3: PH05A1 (Elbert Way, Everest Way, McCloud Drive from Hillsdale Boulevard to Diablo Drive, and Pitt Court)
- District 3: TC04B (north of and including Chenu Drive, east of Morse Avenue, south of Marconi Avenue, and west of Watt Avenue)
- District 3: Garfield Avenue from Verner Avenue (South) to 300 ft north of Spruce Avenue
- District 3: Illinois Avenue from Winding Way to Madison Avenue
- District 3: Madison Avenue from Jackson Street to Harrison Street
- District 3: Madison Avenue from Walnut Avenue to Manzanita Avenue
- District 3: Norris Ave from Engle Avenue to Auburn Boulevard
- District 3: Orange Grove Avenue from Auburn Boulevard to College Oak Drive
AC Overlay Project 2028 Phase C:
- District 3: San Juan Avenue from Winding Way (North) to Madison Avenue
- District 4: Elverta Road from Black Eagle Drive to Walerga Road
- District 4: Hazel Avenue from Elm Avenue to Oak Avenue
2029 Planning
Note: Project locations have not been fully planned. Public input and comments are welcome.