The following list includes closures for all County road ways that are in unincorporated areas, or areas that the County inspects. It does not include state highways, such as Jackson, Hwy 50 and I-80. However, the list of lane closures is not all-inclusive, but rather includes only those closures most affecting the traveling public. Criteria considered include time of day (peak traffic hours), duration, location, number of lanes, and scope of work or event.
Sign up to receive road and lane closure updates via email
Road: Sorento Rd
Bounded by: between Elverta Rd & Rio Linda Rd due to flooding.
Start Date: 12/26/2025
End Date:
Reason for Closure: between Elverta Rd & Rio Linda Rd due to flooding.
Details: between Elverta Rd & Rio Linda Rd due to flooding.
Status: Closed
Road: Arden Way From Watt Ave. to Morse Ave.
Start Date: 1/20/2026
End Date: 12/31/2026
Reason for Closure: Complete Street Rehabilitation
Details: 8a.-4p. All directions of travel will be impacted.
Alternate Route: Alta Arden Expressway / Hurley Way
Status Lane(s): closed
Media Contact: Matt Robinson (916) 875-4517
Onsite Contact: Nick Haney (916) 380-0493
Emergency Closure? No
Supervisor District: District 3
Road: Elk Grove Florin Rd bound by Bridalsmith Drive and Vintage Park Drive,
Start Date: 2/13/2026
End Date: 3/19/2026
Reason for Closure: Sewer Construction Activities
Details: Elk Grove Florin Rd bound by Bridalsmith Drive and Vintage Park Drive, No. 3 Lane southbound closed. Eastbound Bridalsmith Dr road closed, detour below.
Alternate Route: Eastbound on Bridalsmith Drive Detour - Hollowstone Way to Braemore Dr to Vintage Park Drive.
Status: Closed
Media Contact: Nicole Coleman (916) 876-6246
Onsite Contact: Mike Fessler (916) 662-1401
Emergency Closure? No
Supervisor District: District 2
Road: Watt Ave
Bounded by: Jackson Rd. - Elder Creek
Start Date: 5/9/2025
End Date: 4/15/2026
Reason for Closure: Roadway Improvements
Details: 24 hour traffic controls
South Watt Avenue from Jackson Road to Elder Creek will have signals in flash and utilize flaggers with one way traffic control to modify signals and various roadway markings and striping.
Travel lanes have been narrowed and turn lanes adjacent to shoulders have been closed at the intersections to allow room for construction improvement operations.
No.1 NB/SB Lane.
Alternate Route: Florin Perkins Rd.
Status: Lane(s) closed
Media Contact: Matt Robinson (916) 874-4517
Onsite Contact: Darrah Ramsbotham (916) 716-8807
Emergency Closure? No
Supervisor District: District 5: Pat Hume
Date: March 3-19, 2026
Time: 8a.-3:30p.
Description: The No.3 Southbound lane will be closed.
Alternate Route: Cypress Ave. - Walnute Ave.
Reason for Closure: Water line construction
District 3
Onsite Contact: Dennis Blixt (916) 875-2700
Public Information Officer: Matt Robinson (916) 876-4517
March 16-19, 2026 8a.-4p.
Roadway Improvements
The No.1 & 2 East/Westbound lanes will be affected. Expect alternating lane closures.
Alternate Route: Arden Way or Northrop
District 3
Onsite Contact- Daniel Diaz (916) 826-7147
Public Information Officer: (916) 874-4516
March 15-26, 2025 Night work- 9p.-5a.
Frontage improvements
Affected lanes: No. 2 & 3 Northbound
Alternate route: Madison Ave. - Illinois Ave.
Onsite Contact: Dennis Blixt
3/3/2026- 3/20/2026 8a.-3:30p.
No. 1 East/Westbound Lane will be affected.
Alternate Route: Elverta Rd.
Sewer Construction Activities
District 1
Onsite Contact: Tim Wilkerson (916) 875-2782
4/13-4/19/2026 7p.-6a.
Intersections of S. Watt Ave and Fruitridge Rd. / Wayne Court, signals will be placed on flash. Traffic control flaggers will be onsite to assist with travel controls.
Alternate route: Florin-Perkins Rd.
Storm drain improvements
Onsite contact: Colton Wurzel (707) 694-2733
3/22-4/15/2026 8p.-6a.
Madison Ave between Pershing Ave. and Hazel Ave.
Alternating lane closures of the No. 1 and 2 East/Westbound lanes.
Alternate route: Greenback Lane.
Frontage Improvements
Temp alt path of circulation: Opposite side of the street/ pedestrian escorts will also be available.
Onsite contact: Bryan Rosburg (916) 866-2807
3/23/2026 - 6/4/2026 Full Closure- No. 2 Northbound Lane.
Alternate Route: Excelsior Rd. - Elk Grove-Florin Rd.
Road Work Construction Activities
Onsite Contact: K.C. Hood (916) 875-4461
3/17-3/20/2026 Full Closure
Northbound No. 1 & 2 lane closed on Elk Grove-Florin Rd.
3/18-3/20/2026 Full Closure
Southbound No. 1 & 2 lanes
Sewer Construction Activities
Public Information Officer: Nicole Coleman (916) 876-6246
Onsite Contact: Mike Fessler (916) 621-1401
3/29/2026 - 4/30/2026 Night Work 8p. - 6a.
Alternating lane closures in all directions of travel.
Alternate Route: Greenback Lane
Frontage Improvements
Onsite Contact: 916-866-2807
4/15/2026 - 5/7/2026 Night Work 8p. - 6a.
Alternating lane closures of the No. 1, 2 & 3, North/Southbound lanes
Alternate Route: Hazel Ave.
Roadway Paving
Onsite Contact: Bryan Rosburg 916-866-2807
5/1/2026 - 5/24/2026 Night Work 9p. - 6a.
Alternating lane closures of the No. 1, 2 & 3, North/Southbound lanes.
Alternate Route: Howe Ave.
Roadway Paving
Onsite Contact: Bryan Rosburg 916-866-2807
5/4/2026 - 5/27/2026 Full Closure
No. 1 & 2, North/Southbound Lanes.
Alternate Route: Sunrise Blvd.
Roadway Improvements
Onsite Contact: Mark Little 916-215-3951
3/26/2026
Activation of new traffic signals at the intersection of Elk Grove-Florin Rd. & Gerber Rd.
Onsite Contact- Antonio Alvarez (916) 584-0819
3/26/2026 8a. - 3:30p.
No. 1 and 2, North/Southbound lanes will be closed.
Alternate Route: Ulysses Dr.
Onsite Contact: Ryan Yount (916) 336-1322
Construction Management & Inspection Division
916-875-2700 Main Line
After hours inquiries contact SacCounty 311
From Unincorporated Sacramento County Areas: Dial 3-1-1
Outside of Unincorporated Sacramento County Areas: 916-875-4311
Public Information Officer, Matt Robinson: (916) 874-4516