AC Overlay Project 2026 Phase A
Project Master List
| Project Name & Locations | Supv. Distr. | Project Description | Project Engineer | Plans Sent to Utilities | Board Approval | Construction Starts | Construction Complete | Contract Amount ($K) |
| AC Overlay Project 2026 Phase A | 1,3,4 | Place conventional asphalt concrete, rubberized asphalt concrete, rubberized cape seal or slurry seal over the existing pavement; ADA compliant upgrades; Replace damaged culverts. Construction activities will include base repair, raising manholes, and grinding existing pavement prior to paving. | Daniel Lockett | 01/26 (B) | Jan-26 | Jun-26 | Nov-26 | $14,000 |
| Elkhorn Blvd - 26th Ave to 32nd St | ||||||||
| Walerga Rd - Don Julio Blvd to Elkhorn Rd | ||||||||
| Madison Ave - Kenneth Ave to Hazel Ave | ||||||||
| Sunrise Blvd - Sunset Ave to Sunrise Ridge Dr | ||||||||
| Oak Ave - Chestnut Ave to Santa Juanita Ave | ||||||||
| Antelope Rd - Walerga Rd to Elverta Rd | ||||||||
| Watt Ave - El Camino Ave to Marconi Ave | ||||||||
| Walerga Rd - Elkhorn Blvd to Antelope Rd | ||||||||
| 6411 Grant Ave - Culvert Replacement Only | ||||||||