Project Master List

Crews paving road

Names and Locations

April 2026 - This project list is updated quarterly.

65th St Expressway at 53rd Ave Signal Project

Install new traffic signal at the intersection of 65th St. Expressway and 53rd Ave.

AC Overlay Project 2025 Phase A

Place conventional asphalt concrete, rubberized asphalt concrete, or slurry seal over the existing pavement; ADA compliant upgrades. Construction activities will include base repair, raising manholes, and grinding existing pavement prior to paving.

AC Overlay Project 2025 Phase B

Place conventional asphalt concrete, rubberized asphalt concrete, or slurry seal over the existing pavement; ADA compliant upgrades; Bridge Deck Maintenance. Construction activities will include base repair, raising manholes, and grinding existing pavement prior to paving.

AC Overlay Project 2026 Phase A

Place conventional asphalt concrete, rubberized asphalt concrete, rubberized cape seal or slurry seal over the existing pavement; ADA compliant upgrades; Replace damaged culverts. Construction activities will include base repair, raising manholes, and grinding existing pavement prior to paving.

AC Overlay Project 2026 Phase B

Place conventional asphalt concrete, rubberized asphalt concrete, or slurry seal over the existing pavement; ADA compliant upgrades. Construction activities will include base repair, raising manholes, and grinding existing pavement prior to paving.

AC Overlay Project 2026 Phase C

Place conventional asphalt concrete, rubberized asphalt concrete, or slurry seal over the existing pavement; ADA compliant upgrades; Bridge Deck Maintenance. Construction activities will include base repair, raising manholes, and grinding existing pavement prior to paving. Bridge Maintenance include Polyester Concrete Overlay and concrete deck repair.

Alta Arden Expressway - Phase 1

Sidewalk gap closures, buffered bike lanes, restriping, traffic signal modifications, pavement rehabilitation and resurfacing.

Arden Way Complete Streets Project - Phase 1

Streetscape bike and pedestrian improvements on Arden Way.

Arden Way Complete Streets Project - Phase 2

Streetscape bike and pedestrian improvements on Arden Way.

Bell Street Safe Routes to School

Install bicycle and pedestrian improvements. Sidewalk infill, ADA ramps, school crossings, bicycle lanes, pedestrian signal, timed school zone flashing beacon, traffic signal upgrades and improved street lighting at the intersections.

Bradshaw Rd at Ballinger Dr Traffic Signal

Install new traffic signal at Bradshaw Road and Ballinger Dr

Bradshaw Rd and Elder Creek Rd Improvement Project

Intersection widening at the intersection of Bradshaw Rd and Elder Creek Rd

Bradshaw Rd and Gerber Rd Improvement Project

Intersection widening at the intersection of Bradshaw Rd and Gerber Rd, widen the north side of Gerber Rd between Diamond Ranch Rd and Bradshaw Rd, box culvert replacement.

Bradshaw & Jackson Intersection Improvements

Intersection improvements and signal modifications to relieve congestion.

Bradshaw Road Widening

Widen Bradshaw Road to a six-lane thoroughfare from Kiefer Blvd to Jackson Rd. Modify the traffic signal at Bradshaw Rd and Kiefer Blvd to include an additional through lane in the southbound direction. Improvements include landscaped median, curb, gutter, and sidewalk, and 10' trail.

Bridge Preventive Maintenance Program (BPMP)

Bridge Preventive Maintenance on various bridges including Methacrylate treatment, joint seal replacement, and/or overlay repair as identified in Caltrans SM&I reports.

Calvine Road Widening Project

Widen Calvine Road from 4 to 6 lanes on both sides (City of Elk Grove on south side). Improvements include widening of RR and creek crossing, curb, gutter, and sidewalk, signal modifications, and street lighting.

Countdown Pedestrian Head Installation Project

Project will provide enhanced pedestrian safety and compliance at signalized intersections with existing pedestrian crossings by installing countdown pedestrian modules. It will consist of 167 signalized intersections.

Clay Station Road - Hadselville Creek Water Diversion

Install water diversions at two creeks on Clay Station Road to allow in-house forces a place to work

Curb, Gutter, and Sidewalk Replacement Project 2025

Replacement of damaged Curb, Gutter and Sidewalk throughout the County.

Dry Creek Pkwy Phase 2 Multi Use Trail Project

New paved Class I Multi-use trail with shoulder, 2 bridges and roadway crossing evaluation.

Elkhorn Blvd at 28th St. Signal Project

Install new traffic signal at the intersection of Elkhorn Blvd and 28th St.

Elkhorn Boulevard Complete Streets Project

Construct a Class IV separated bikeway, intersection and sidewalk improvements.

Elverta Road Improvement Project

Replace existing two lane bridge at Dry Creek with a six-lane (future) reinforced concrete bridge, replace existing culvert on Elverta Rd. and modify the signal at Elverta Rd and 28th St. The project will widen Elverta Rd. to 4 lanes with landscaped median, and Class II bike lanes.

Eschinger Road Intersection Improvements

Widen the intersections of Eschinger Rd at Carroll Rd and Bruceville Rd.

Fair Oaks Blvd Bike Pedestrian Mobility Project Phase 2

Create a smart growth corridor with barrier separated bicycle lanes, and improved pedestrian access. Resurface roadway and install landscaping, shade trees, and street lighting. New traffic signals at University Ave/FOB and Fulton Ave/FOB. Signal modifications at Sierra Blvd/FOB.

Florin Road Bicycle Pedestrian Improvements

Install bike lanes along Florin Road, upgrade traffic signals to accommodate bikes at all intersections, construct associated ADA Improvements, install roadway lighting, and roadway resurfacing along portions of Florin Rd between Franklin Blvd and Power Inn Rd.

Folsom Blvd Complete Streets Improvements Phase 2

Install bike lanes, sidewalks, street lights, landscaping, fencing, ADA ramp and signal upgrades at La Riviera Dr, Tiber Dr, and Mayhew Rd.

Franklin Blvd Bridge Replacement at Lost Slough

Replace bridge at Lost Slough on Franklin Blvd.

Freeport Bridge Deck Repair

Maintenance Project to repair damaged bridge deck welds

Freeport Delta Monument Signs Project

Easement acquisitions, final design, fabrication and construction of gateway monuments and interpretative sign on Freeport Blvd.

Gerber Road Traffic Signals Project

Install new traffic signals at Gerber Rd at Passalis Lane and Gerber Rd at Excelsior Rd.

Greenback Lane Improvements and Undergrounding

Install Class II Bike Lanes, infill sidewalk and separated sidewalk, ADA upgrades: curb ramps, traffic signal modifications with bicycle detection, bus stop and transit access improvements, pavement repair, and landscape/streetscape enhancements including raised/landscaped medians. Includes signalization of the Chestnut Avenue/ Greenback Lane intersection and undergrounding of overhead utility lines.

Hazel Ave at US Highway 50 Interchange - Segment 1

Reconstruct portions of the US 50 Hazel Ave Interchange and improvements to eastbound US 50, including ramp modifications at Aerojet Rd and Folsom Blvd off ramps. Includes a grade separated crossing of the Gold Line Light Rail system and Folsom Blvd, multi-use path from American River Parkway to south of US 50. First segment of larger project described above.

Madison Ave Fair Oaks Blvd to Hazel Ave

Capacity and complete street improvements on Madison Ave between Sunrise Blvd and Hazel Ave in the Fair Oaks, Citrus Heights, and Orangevale areas

Meister Way Improvement Project

Reconstruct Meister Way to a two-lane arterial. Project includes installation of traffic signals at Metro Air Parkway, Badiee Drive, and Lone Tree Road and will also include sewer, water, and storm drain improvements.

Metro Air Parkway Ramp Signalization Project

Install signals at the southbound and northbound off-ramps at the I-5/Metro Air Pkwy Interchange. Slurry and restripe.

Michigan Bar Rd/ Cosumnes River Bridge Replacement

"Replacement of an existing modular concrete panel deck on modular steel box deck trusses and steel girders bridge w/new two-lane road concrete slab bridge. Approx. 1 mile n/o SR16. Bridge No 24C0056"

Neighborhood Traffic Management Project 2026

Install speed bumps, speed tables, and corresponding signage at various locations within the County.

New Hope Road Bridge Replacement at Grizzly Slough

Replacement of an existing two-lane road concrete bridge with a new two-lane bridge on New Hope Road at Grizzly Slough waterway and about half a mile n/o the San Joaquin County Line.

Oakdale Elementary, College Oak Dr

"Install accessible corner ramp/sidewalk at Polk St and Myrtle Ave; install street lights on College Oak Dr. County's Neighborhood Improvement Initiative"

Power Line Road Improvements - Phase 2/ Elverta Rd

Widen Powerline Rd and Elverta Rd to add a center turn lane and associated drainage improvements. Waterline will also be installed.

Retro-reflective Signal Backplate Installation Project

Project will provide enhanced visibility of traffic signal indications by upgrading signal backplates to include retroreflective yellow boarders. It will consist of 512 signalized intersections.

Sacramento Northern Bike Trail Extension Project

PA&ED and Public Outreach including Placer County for a 1.5 miles extension of the existing class 1 (bike) trail.

Skyking Road Extension & Phelan Drive Project

This project will extend skyking Road from Metro Air Parkway to Phelan Dr. The extension of Skyking Rd will be a two-lane collector.

South Sacramento Sidewalk Gap Closure Project

Install sidewalk at various locations in South Sacramento

South Watt Ave Improvements Florin Rd to SR16

Widen South Watt Ave from 2 lanes to 4 lanes, including railroad crossing and bridge at Morrison Creek.

South Watt Ave Improvements SR16 to Kiefer Blvd

Widen South Watt Ave from 5 lanes to 6 lanes with sidewalks and signal modifications.

Stockton Blvd Complete Streets Project

Construct Class IV bicycle lanes or a two-way cycle track on one side of Stockton Blvd, sidewalk infill, signalization of one intersection, slurry seal and restriping of entire roadway/bikeway.

Sunrise Boulevard Bridge over American River

BIP Feasibility Study and HBP Scour Countermeasures

Sunrise Boulevard Wall Replacement Project

Replace approximately 600 feet of the leaning wall along the west side of Sunrise Blvd.

Twin Cities Road Bridge Replacement

Remove the existing movable swing bridge over Snodgrass Slough at Twin Cities Road and replace it with a reinforced concrete bridge.

Tyler Island Bridge Replacement Project

Replace moveable bridge over Georgiana Slough or BPMP pending Caltrans required soil analysis study.

Walmort Bridge Repairs

Replace existing 2-lane wooden bridge with new 2-lane concrete bridge.

Walnut Grove Bridge over Sacramento River BPMP

Preventive Maintenance Project, Bridge No. 24C0005

Walnut Grove over Mokelumne River Bridge

Replace the existing bridge with new movable bridge to accommodate 2 vehicle lanes and shoulder and meet safety and design standards.

Waterman Road CCTC Crossing

Install a new at-grade crossing on Waterman Road at the existing CCTC Railroad Crossing

Whitney Avenue Road Diet & Multi Modal Improvement Project

Create a multi-model corridor with separated bicycle lanes, improved pedestrian access, resurfaced roadway. Traffic signal modifications at Whitney/Watt Ave, Whitney Ave/Becerra way, Whitney Ave/Norris Ave, Whitney Ave/Eastern Ave, and Whitney Ave Foster way.

Winter Storm 2022-2023 Alta Mesa Culvert

Replace culvert under Alta Mesa Road damaged by storm.

Winter Storm 2022-2023 Ione Road

Replace culvert under for Ione Road damaged by storm.

Wyda Way Sidewalk Gap Closure

Sidewalk infill, accessible ramps, street lights, drainage improvements, pavement repair.