Project Master List

Elverta Road Improvement Project

Project Name & LocationsSupv. Distr.Project Description
Project EngineerPlans Sent to Utilities
Board ApprovalConstruction StartsConstruction CompleteContract Amount ($K)
Elverta Rd: Watt Ave to Dutch Haven Blvd
4
Replace existing two lane bridge at Dry Creek with a six-lane (future) reinforced concrete bridge, replace existing culvert on Elverta Rd. and modify the signal at Elverta Rd and 28th St. The project will widen Elverta Rd. to 4 lanes with landscaped median, and Class II bike lanes.
Gabriel Flores
02/19 (B)Jan-27
Apr-27

Nov-28

$16,772

Federal: HBP, STIP, RSTP