Project Master List

AC Overlay Project 2026 Phase B

Project Name & Locations Supv. Distr. Project Description
Project Engineer Plans Sent to Utilities
Board Approval Construction Starts Construction Complete Contract Amount ($K)
AC Overlay Project 2026 Phase B
1,2,5, City of Sac, RC
Place conventional asphalt concrete, rubberized asphalt concrete, or slurry seal over the existing pavement; ADA compliant upgrades. Construction activities will include base repair, raising manholes, and grinding existing pavement prior to paving.
Brandon Lew
02/26 (B) Jan-26
Apr-26
Sep-26 $18,900
Florin Rd - French Rd to 1,000' e/o Gardner Ave
 
47th Ave - Perry Ave to Roosevelt Ave
48th Ave - Perry Ave to Roosevelt Ave
Baker Ave - West end to Stockton Blvd
Scott Rd - Boys Rand Rd to 3 miles north
Consumnes Rd - Dillard Rd to Wilton Rd
"RM03A2 (North of Jackson Rd, East of Watt Ave, South of
Wildrose Wy, West of Thornhill Dr)"
Alta Mesa Rd - Twin Cities Rd to Valinsin (Curve)
Isleton Rd-5,000 ft s/o Andrus Isl. Rd to Highway 160
River Rd - 660 ft s/o Locke Rd to 2,000' south
"RM06A (North of Kiefer Blvd, East of Rosemont Dr, South of
Rosewood Dr, West of South Port Dr)"
"RP01C West (Hyannis Wy [West of Bradshaw Rd],
Adirondack Wy, Chad Ct)"
Calvine Rd - Highway 99 to 250' w/o Cliffcrest Dr
Gerber Rd - French Rd to Elk Grove Florin Rd
Ione Culvert