New Hope Road Bridge Replacement at Grizzly Slough
Project Master List
| Project Name & Locations | Supv. Distr. | Project Description | Project Engineer | Plans Sent to Utilities | Board Approval | Construction Starts | Construction Complete | Contract Amount ($K) |
New Hope Rd: Grizzly Slough to half a mile n/o the San Joaquin County Line.
| 5 | Replacement of an existing two-lane road concrete bridge with a new two-lane bridge on New Hope Road at Grizzly Slough waterway and about half a mile n/o the San Joaquin County Line. | Michael Dunne-Vecchio Mark Thomas | 10/25 (C) | Dec-25 | Apr-26 | Oct-26 | $4,536 Federal (HBP) |