Project Master List

New Hope Road Bridge Replacement at Grizzly Slough

Project Name & LocationsSupv. Distr.Project Description
Project EngineerPlans Sent to Utilities
Board ApprovalConstruction StartsConstruction CompleteContract Amount ($K)

New Hope Rd: Grizzly Slough to half a mile n/o the San Joaquin County Line.



5

Replacement of an existing two-lane road concrete bridge with a new two-lane bridge on New Hope Road at Grizzly Slough waterway and about half a mile n/o the San Joaquin County Line.

Michael Dunne-Vecchio

Mark Thomas

10/25 (C)Dec-25
Apr-26

Oct-26

$4,536

Federal (HBP)