AC Overlay Project 2026 Phase B
Project Master List
| Project Name & Locations | Supv. Distr. | Project Description | Project Engineer | Plans Sent to Utilities | Board Approval | Construction Starts | Construction Complete | Contract Amount ($K) |
| AC Overlay Project 2026 Phase B | 1,2,4, 5 City of Sac | Place conventional asphalt concrete, rubberized asphalt concrete, rubberized cape seal or slurry seal over the existing pavement; ADA compliant upgrades; Construction activities will include base repair, raising manholes, and grinding existing pavement prior to paving. | Brandon Lew | 04/26 (C) | Jan-26 | Jul-26 | May - 27 | $13,959 |
| Florin Rd - French Rd to 1,000' e/o Gardner Ave | ||||||||
| 47th Ave - Perry Ave to Roosevelt Ave | ||||||||
| 48th Ave - Perry Ave to Roosevelt Ave | ||||||||
| Baker Ave - West end to Stockton Blvd | ||||||||
| Scott Rd - Boys Ranch Rd to 3 miles north | ||||||||
| Consumnes Rd - Dillard Rd to Wilton Rd | ||||||||
| RM03A2 (North of Jackson Rd, East of Watt Ave, South of Wildrose Wy, West of Thornhill Dr) | ||||||||
| Alta Mesa Rd - Twin Cities Rd to Valinsin (Curve) | ||||||||
| Isleton Rd-5,000 ft s/o Andrus Isl. Rd to Highway 160 | ||||||||
| River Rd - 660 ft s/o Locke Rd to 2,000' south | ||||||||
| RM06A (North of Kiefer Blvd, East of Rosemont Dr, South of Rosewood Dr, West of South Port Dr) | ||||||||
| RP01C West (Hyannis Wy [West of Bradshaw Rd], Adirondack Wy, Chad Ct) | ||||||||
| Calvine Rd - Highway 99 to 250' w/o Cliffcrest Dr | ||||||||
| Gerber Rd - French Rd to Elk Grove Florin Rd | ||||||||
| Ione Culvert | ||||||||