Project Master List

AC Overlay Project  2026 Phase B

Project Name & LocationsSupv. Distr.Project Description
Project EngineerPlans Sent to Utilities
Board ApprovalConstruction StartsConstruction CompleteContract Amount ($K)
AC Overlay Project 2026 Phase B
1,2,4, 5 City of Sac
Place conventional asphalt concrete, rubberized asphalt concrete, rubberized cape seal or slurry seal over the existing pavement; ADA compliant upgrades; Construction activities will include base repair, raising manholes, and grinding existing pavement prior to paving.
Brandon Lew
04/26 (C)Jan-26
Jul-26
May - 27
$13,959
Florin Rd - French Rd to 1,000' e/o Gardner Ave 
47th Ave - Perry Ave to Roosevelt Ave
48th Ave - Perry Ave to Roosevelt Ave
Baker Ave - West end to Stockton Blvd
Scott Rd - Boys Ranch Rd to 3 miles north
Consumnes Rd - Dillard Rd to Wilton Rd
RM03A2 (North of Jackson Rd, East of Watt Ave, South of Wildrose Wy, West of Thornhill Dr)
Alta Mesa Rd - Twin Cities Rd to Valinsin (Curve)
Isleton Rd-5,000 ft s/o Andrus Isl. Rd to Highway 160
River Rd - 660 ft s/o Locke Rd to 2,000' south 
RM06A (North of Kiefer Blvd, East of Rosemont Dr, South of Rosewood Dr, West of South Port Dr) 
RP01C West (Hyannis Wy [West of Bradshaw Rd], Adirondack Wy, Chad Ct) 
Calvine Rd - Highway 99 to 250' w/o Cliffcrest Dr 
Gerber Rd - French Rd to Elk Grove Florin Rd 
Ione Culvert