AC Overlay Project 2027 Phase F

Project Name & LocationsSupv. Distr.Project Description
Project EngineerPlans Sent to Utilities
Board ApprovalConstruction StartsConstruction CompleteContract Amount ($K)
AC Overlay Project 2027 Phase F3,4, City of SacThe project consists of placing conventional asphalt concrete, rubberized asphalt concrete, or slurry seal over the existing pavement surface. Construction activities also include installing ADA compliant upgrades, repairing deteriorated pavement (base repair), adjusting manholes, and grinding sections of the existing pavement to accommodate an overlay.Daniel Lockett07/26 (A)Jan-27
Apr-27
Nov-27$18,810
AP03A (Drayton Heights area)  
AP04A (Wayland Ave & Clindon Rd area plus Imran Dr)
FF04A (Foothill Farms north of Leader Ave)
F010B (Kewanee St area)
Antelope Rd - Don Julio Blvd to Antelope North Rd
Auburn Blvd - Park Dr to Myrtle Ave
Ethan Way - Arden Way to El Camino Ave
Hurley Way - Ethan Way to Watt Ave
Madison Ave - Fair Oaks Blvd to Kenneth Ave
Sunrise Blvd - Sunrise Ridge Dr to Madison Ave