AC Overlay Project 2028 Phase B
Project Master List
| Project Name & Locations | Supv. Distr. | Project Description | Project Engineer | Plans Sent to Utilities | Board Approval | Construction Starts | Construction Complete | Contract Amount ($K) | ||
| AC Overlay Project 2028 Phase B | 3 | The project consists of placing conventional asphalt concrete, rubberized asphalt concrete, or slurry seal over the existing pavement surface. Construction activities also include installing ADA compliant upgrades, repairing deteriorated pavement (base repair), adjusting manholes, and grinding sections of the existing pavement to accommodate an overlay. | Daniel Lockett | Jan-28 | Apr-28 | Nov-28 | $10,016 | |||
| PH05A1 (Everest Way area) | ||||||||||
| TC04B (Fairway Estates) | ||||||||||
| Garfield Ave - Verner Ave (S) to 300' N/O Spruce Ave | ||||||||||
| Illinois Ave - Winding Way to Madison Ave | ||||||||||
| Madison Ave Jackson St to Harrison St | ||||||||||
| Madison Ave - Walnut Ave to Manzanita Ave | ||||||||||
| Norris Ave - Engle Ave to Auburn Bl | ||||||||||
| Orange Grove Ave - Auburn Bl to College Oak Dr | ||||||||||