Project Master List

AC Overlay Project 2028 Phase B

Project Name & LocationsSupv. Distr.Project Description
Project EngineerPlans Sent to Utilities
Board ApprovalConstruction StartsConstruction CompleteContract Amount ($K)
AC Overlay Project  2028 Phase B3The project consists of placing conventional asphalt concrete, rubberized asphalt concrete, or slurry seal over the existing pavement surface. Construction activities also include installing ADA compliant upgrades, repairing deteriorated pavement (base repair), adjusting manholes, and grinding sections of the existing pavement to accommodate an overlay.Daniel Lockett Jan-28
Apr-28
Nov-28$10,016
PH05A1 (Everest Way area)  
TC04B (Fairway Estates)
Garfield Ave - Verner Ave (S) to 300' N/O Spruce Ave
Illinois Ave - Winding Way to Madison Ave
Madison Ave Jackson St to Harrison St
Madison Ave - Walnut Ave to Manzanita Ave
Norris Ave - Engle Ave to Auburn Bl
Orange Grove Ave - Auburn Bl to College Oak Dr