Folsom Boulevard Complete Street Improvements Phase 2 Project

​​This project is the second phase to implement a segment of the approved Folsom Boulevard Complete Street Master Plan. This project will improve pedestrian accessibility, bicyclist safety, night visibility, and aesthetics for one mile along the south side of Folsom Boulevard between Starfire Drive and Mayhew Road in Cordova (District 5). The project includes installation of buffered bike lanes, landscaped frontage with decorative street lights, a separated sidewalk, update sidewalk ramps to current ADA standards, and metal rail fencing for separation from the Sacramento Regional Transit District Light Rail Tracks.

Project Newsletters​

Sign Up to receive project newsletters and updates by email and text messages!​​

Project Benefits

  • Improved safety for bicyclists: delineated and signed bike lanes with street lighting.
  • Improved safety for pedestrians: updated pedestrian crossing signal equipment, landscape separated sidewalk, and street lighting.
  • Improved access for the disabled: ADA compliant sidewalk ramps and equipment at signalized street crossings (audible, vibrotactile push buttons, countdown pedestrian crossing) .

Project Schedule

  • Preliminary Design: 2023.
  • Environmental Review: 2023 to 2024.
    • OPER Control No.: PLER2023-00101​.
    • CEQA Document Release to Public: TBD
    • CEQA Environmental Action at Board of Supervisors Meeting: - TBA
    • NEPA Determination: - TBA
  •  Final Design: 2024.
  • Right-of-Way Acquisition: 2024.
  • Construction: 2025.

Project Links

Funding

  • Estimated construction cost is $6 million with funding to be determined.​