2025/2026
Please note: The following roadways have been identified for pavement maintenance and rehabilitation work to be completed in 2025/2026. Additional locations may be identified because maintenance needs can develop within a short period of time due to an aging roadway system. These locations will be reported in the Completed Project Expenditure Report.
AC Overlay Project 2025 Phase A
- District 1/3/4: Watt Avenue from Roseville Road to James Way / Street (Map 1)
- District 3: Airbase Drive from Watt Avenue to overpass (Map 1)
- District 4: Roseville Road from Watt Avenue to Madison Avenue (Map 1)
- District 3: PH07B1 (south of Andrea Boulevard, north of Woodside Drive) (Map 2)
- District 3: Tarleton Drive area (Map 3)
- District 2: FR10B Partial (south of Fruitridge Road, east of 41st Street) (Map 4)
- District 3: Sunrise Boulevard from Winding Way to Sunset Boulevard (Map 5)
- District 5: Grand Island Road from 6,000 ft north of the Grand Island Mansion to State Route 160 (Map 6)
- District 5: River Road from 4,560 south of Twin Cities Road to 660 feet south of Locke Road (Map 7)
- District 3: CM11C (Hazelwood Drive area) (Map 8)
- District 3: Keane Drive from Kipling Drive to east end (Map 9)
- District 3/4: Madison Avenue from Hazel Avenue to Blue Oak Drive (Map 10)
- District 3/Citrus Heights: Madison Ave from San Juan Avenue to Fair Oaks Boulevard (Map 11)
- District 5: RM03A1 (south of Alderson Way, west of Thornhill Drive) (Map 12)
- District 5: Crosswalk at Arcohe Union Elementary School (Ivie Road) (no map)
Phase A 2025 Map
AC Overlay Project 2025 Phase B
- District 4: Elkhorn Boulevard from 18th Street to 26th Street (Map 1)
- District 4/Rancho Cordova: Grant Line Road from Jackson Road to Keiver Boulevard (Map 2)
- District 5: Bradshaw Road from Folsom Boulevard to Hyannis Way (Map 3)
- District 5: Isleton Road from 1,100' north of Andrus Island Road to 3,300' south of Andrus Island Road (Map 4)
- District 5: Twin Cities Road from Cosumnes River (8,830 ft west of Pellandini Road) to Pellandini Road (Map 5)
- District 3: FF01B (south of Leader Way, north of Palm Avenue, west of Garfield) (Map 6)
- District 3: Fair Oaks Boulevard from Manzanita Avenue to Marshall Avenue (Map 7)
- District 3: FO14C Partial (Hidden Valley Circle area) (Map 8)
- District 3: FO08B Partial (Buchanan Drive area) (Map 9)
- District 3: TC04A (south of Marconi Avenue, north of El Camino Avenue) (Map 10)
2026 Planning
Please note: The following roadways have been identified for pavement maintenance and rehabilitation work to be completed in 2026. Additional locations may be identified because maintenance needs can develop within a short period of time due to an aging roadway system. These locations will be reported in the Completed Project Expenditure Report..
AC Overlay Project 2026 Phase A
- District 1/4: Elkhorn Blvd from 26th Ave to 32nd St
- District 3/4: Walerga Rd from Don Julio Blvd to Antelope Rd
- District 3/4: Madison Ave from Kenneth Ave to Hazel Ave
- District 3: Sunrise Blvd from Sunset Ave to Sunrise Ridge Br
- District 4: Oak Ave from Chestnut to Santa Juanita Ave
- District 3/4: Antelope Rd from Walerga Rd to Elverta Rd
- District 3: Watt Ave form El Camino Ave to Marconi Ave
2026 Phase A Map
AC Overlay Project 2026 Phase B
- District 1/2: Florin Rd from French Rd to 1,000' e/o Gardner Ave
- District 1/Sac: 47th Ave from Perry Ave to Roosevelt Ave
- District 1/Sac: 48th Ave from Perry Ave to Roosevelt Ave
- District 1: Baker Ave from West end to Stockton Blvd
- District 4: Scott Rd from Boys Rand Rd to 3 miles north
- District 5: Consumnes Rd from Dillard Rd to Wilton Rd
- District 5: RM03A2 (Canberra Dr Area)
- District 5: Sargent Ave from Pringle Ave to Live Oak Ave
- District 5: Alta Mesa Rd from Twin Cities Rd to Valinsin (Curve)
- District 5/RC: Sunrise Blvd from Jackson Rd to Kiefer Blvd
- District 5: Isleton Rd from 5,000 ft s/o Andrus Island Rd to 6,100 ft south
- District 5: River Rd from 660 ft s/o Locke Rd to 2,000 ft south
- District 5: RM06A (Imperial Wy area)
- District 5: RP01C West (Hyannis Wy Area, w/o Bradshaw)
Sac = City of Sacramento
RC = City of Rancho Cordova
2026 Phase B Map
AC Overlay Project 2026 Phase C
- District 3: Greenback Ln from HWY I80 to CH City Limits
- District 3: San Juan Ave from Fair Oaks Blvd to Winding Wy (North)
- District 3: Watt Ave from Arden Wy to Cottage Wy
2026 Phase C Map
AC Overlay Project 2026 Phase D
- District 3: Fair Oaks Village Park area
2026 Phase D Map
2027 Planning
Please note: Project locations have not been fully planned. Public input and comments are welcome.