Project Description
Rehabilitate arterial and residential streets, including: repair failed areas of the pavement (base repair); overlay the roadway with asphalt concrete pavement; repair damaged curb, gutter, sidewalk; and various items of work to complete the overlay including but not limited to placing slurry seal, adjusting manholes, and restriping the roadway.
Project locations cannot be fully planned or anticipated in advance, as these maintenance needs develop within a short period of time due to an aging roadway system. At this time, the following roadways have been identified for pavement maintenance and rehabilitation work to be completed in FY 2021-22.
During the year, work will be completed at additional locations as the needs are identified, and these locations will be reported in the Completed Project Expenditure Report: